Товарно-сырьевая торговая площадка

CAP CERAMIC DISK RDL LONG LEADS

CAP CERAMIC DISK RDL LONG LEADS
  • AEC-Q200 compliant.
  • 1,000 cycles guaranteed under heat shock testing at –55°C to +125°C.
  • It can be used as a capacitor for snubber circuits used in automobiles (EV, HEV).
  • Low dissipation factor, and decreased self-heating temperature in the high frequency, and high voltage application.
  • These products shall conform to RoHS Directive due to lead(Pb) free of lead wire and internal solder material.
  • Compatible with halogen-free external resin coating

Характеристики

Бренд TDK
Schedule B 8532240020
HTSN 8532230060
Страна происхождения Китай
Рабочая температура -25 to 125 °C
Lead Finish TIN OVER NICKEL
Dielectric R
SKU: CK45-R3AD102K-GRA Поставщик: по запросу